Propulsion occurs when using our CDCS preparation quiz. They can even broaden amplitude of your horizon in this line. Of course, knowledge will accrue to you from our CDCS training guide. There is no inextricably problem within our CDCS Learning Materials. Motivated by them downloaded from our website, more than 98 percent of clients conquered the difficulties. So can you as long as you buy our CDCS exam braindumps.
EXIN CDCS Exam Syllabus Topics:
Topic
Details
Topic 1
- Data Centre Environmental Considerations and Efficiency: This section evaluates the proficiency of data center professionals in addressing environmental factors and promoting efficiency within data center operations. The target audience, including data center managers and engineers, will be tested on their ability to identify and implement measures that enhance energy efficiency, cooling management, and sustainable practices.
Topic 2
- Data Centre Life Cycle and Standards: This section of the exam measures the skills of data center professionals and covers the various stages involved in the life cycle of a data center, from planning and design to implementation and decommissioning.
Topic 3
- Designing and Implementing a Data Centre: In this module, the exam assesses the knowledge of Exin data center professionals tasked with the design and implementation of data centers. Candidates will learn the key principles of creating an efficient data center layout, including considerations for scalability, redundancy, and security.
EXIN Believes in Their Real CDCS Exam Dumps
Many clients may worry that their privacy information will be disclosed while purchasing our CDCS quiz torrent. We promise to you that our system has set vigorous privacy information protection procedures and measures and we won’t sell your privacy information. The CDCS Quiz prep we sell boost high passing rate and hit rate so you needn’t worry that you can’t pass the exam too much. But if you fail in please don’t worry we will refund you. Take it easy before you purchase our CDCS quiz torrent.
EXIN EPI Certified Data Centre Specialist Sample Questions (Q104-Q109):
NEW QUESTION # 104
You are allowed to use a calculator for this question. The total power consumption of the ICT equipment in a rack is 6 kW. The equipment is traditional ICT equipment with a Delta-T of approximately 11 °C / 20 °F.
Calculate the approximate CFM required to cool the equipment in the rack.
- A. Approximately 500 CFM
- B. Approximately 1,500 CFM
- C. Approximately 1,000 CFM
- D. Approximately 160 CFM
Answer: C
Explanation:
To calculate the cooling airflow requirement for ICT equipment, you can use the formula:
CFM=Power (kW)×3160#T(°F) ext{CFM} = rac{ ext{Power (kW)} imes 3160}{Delta T ( ext{°F})} CFM=#T(°F)Power (kW)×3160 For equipment consuming 6 kW with a Delta-T of 20°F:
CFM=6×316020=948#1,000 CFM ext{CFM} = rac{6 imes 3160}{20} = 948 approx 1,000 , ext{CFM} CFM=206×3160=948#1,000CFM Detailed Explanation:
This formula provides an estimate of the cubic feet per minute (CFM) of air required to cool the equipment based on its power consumption and the temperature difference (Delta-T) between intake and exhaust. The Delta-T represents the cooling effectiveness of the airflow.
EPI Data Center Specialist References:
EPI recommends using this calculation for determining airflow requirements in data centers, ensuring that cooling systems are adequately sized to maintain equipment within safe temperature limits.
NEW QUESTION # 105
You are allowed to use a calculator for this question. A battery bank is rated at a total capacity of 600 Ah.
Calculate how much charging current the rectifier should be able to supply as charging current.
- A. 12 Amperes
- B. 30 Amperes
- C. 60 Amperes
- D. 80 Amperes
Answer: B
Explanation:
To determine the charging current for a battery bank, a general rule of thumb is that the charging current should be 5% of the total battery capacity. For a battery rated at 600 Ah, this calculation would be:
600 Ah×0.05=30 Amperes600 , ext{Ah} imes 0.05 = 30 , ext{Amperes}600Ah×0.05=30Amperes This ensures the battery is charged efficiently without overloading the rectifier or risking battery damage.
Detailed Explanation:
Battery charging current is typically set as a percentage of the battery's capacity to balance effective charging with longevity and safety. A 5% charging rate is standard for lead-acid batteries, which would be 30 Amperes for a 600 Ah battery bank.
EPI Data Center Specialist References:
EPI standards recommend calculating charging currents based on a percentage of the battery capacity to ensure safety and efficiency, aligning with best practices for battery management in data centers.
NEW QUESTION # 106
Three data centers are benchmarked on facilities energy efficiency.
Data center A has achieved a PUE of 2.45.
Data center B has achieved a PUE of 1.20.
Data center C has achieved a PUE of 1.90.
Which of the data centers is operating at the highest facility efficiency?
- A. Data center C
- B. Data center A
- C. Data center B
- D. PUE does not indicate efficiency
Answer: B
Explanation:
A Power Usage Effectiveness (PUE) of 1.20 (achieved by Data Center B) indicates the highest facility efficiency among the three data centers. A lower PUE value signifies better energy efficiency, as it means that a greater proportion of the total energy consumed is used directly for IT equipment rather than for cooling, lighting, or other facility needs.
Detailed Explanation:
PUE is calculated as the ratio of total facility energy to IT equipment energy. A PUE close to 1.0 suggests that almost all the energy is dedicated to computing processes, with minimal overhead. With PUE values of 2.45,
1.20, and 1.90, Data Center B (1.20) operates most efficiently by devoting a higher percentage of its total energy to IT equipment.
EPI Data Center Specialist References:
The EPI curriculum emphasizes PUE as a key metric for data center efficiency, with lower values representing better performance. Achieving a PUE near 1.0 aligns with industry best practices for energy- efficient data center design and operation.
NEW QUESTION # 107
You are allowed to use a calculator for this question.
A computer room has a net volume of approximately 2,500 m³ / 88,287 ft³.
The temperature is 20 °C / 68 °F.
The required design concentration is 7%.
The S-Factor is 0.1359 (metric) / 1.885 (imperial).
Calculate the amount of gas required for this computer room based on FM200. What is the correct weight?
- A. Approximately 820 kg / 1,800 lbs
- B. Approximately 1,390 kg / 3,000 lbs
- C. Approximately 1,640 kg / 3,600 lbs
- D. Approximately 410 kg / 900 lbs
Answer: A
Explanation:
The amount of FM200 gas required can be calculated using the formula:
Weight of Gas=Net Volume×Design Concentration×S-Factor ext{Weight of Gas} = ext{Net Volume} imes ext{Design Concentration} imes ext{S-Factor}Weight of Gas=Net Volume×Design Concentration×S-Factor Using metric units:
Net Volume: 2,500 m³
Design Concentration: 7% (or 0.07)
S-Factor: 0.1359
Calculation:
2,500 m3×0.07×0.1359=821.325 kg2,500 , ext{m}